Transarc 130i, 07 preliminary check of the main inverter board – Tweco 130i Transarc Service Manual User Manual

Page 47

Advertising
background image

TRANSARC 130i

Manual 0-5282 6-5

TROUBLESHOOTING

6.07 Preliminary check of the main inverter board

!

Read and follow safety information in Section 6.03 before proceeding.

A-11845

IGBT Testing

Multimeter Lead Placement

Diode Voltage

IGBT V8

Positive meter lead to testpoint 3

Negative meter lead to testpoint 4

0.2 – 0.8 VDC

IGBT T1

Positive meter lead to testpoint 5

Negative meter lead to testpoint 6

0.2 – 0.8 VDC

IGBT T4

Positive meter lead to testpoint 7

Negative meter lead to testpoint 8

0.2 – 0.8 VDC

Table 6-3: IGBT’s, Multimeter set to measure Diode Voltage

Advertising