Field operations, Final field checklists – Great Plains NTA2007 Operator Manual User Manual

Page 68

Advertising
background image

64

NTA607 or NTA2007

Table of Contents

Index

Great Plains Manufacturing, Inc.

166-372M

Table of Contents

Index

2012-01-05

Field Operations

Final Field Checklists

Use the following tables to develop a final checklist for
your tractor/air drill configuration.

Additional or fewer steps may be necessary depending
on tractor features, air drill options and planting
accessories.

Mechanical Checklist

Page

❑ Check all tire pressures

152

❑ Tongue height preset

32

❑ Implement unfolded

35

❑ Marker extension set

100

❑ Marker disc angle set

101

❑ Check ladders stowed.

46

Electrical Checklist

Page

❑ Verify electrical hook-ups solid

29

❑ Set rear beacon switch off

30

❑ Check seed monitor terminal and observe

any diagnostic messages

a

❑ Configure monitor for crop and population

a

a.

Refer to DICKEY-john

®

Air Cart Control manual.

Hopper and Air System Checklist

Page

❑ Meter doors closed

50

❑ Manifold to hopper seal
❑ Materials loaded

51

❑ Hose routings - no sags, no pinches (check

wing-folded & field positions)

-

❑ Hoses fully connected to meters, towers

and openers

-

Frame Mounted Coulter Checklist

Page

❑ Coulter blade wear

92

❑ Coulter to row alignment

92

❑ Coulter down-force

93

Row Units Checklist

Page

❑ Preset depth handles alike.

98

❑ Preset down force springs alike, except in

tracks.

95

❑ Check wheel scraper gaps (if installed)

96

Hydraulic System Checklist

Page

❑ Check tractor hydraulic reservoir full

-

❑ Inspect connections for leaks

-

❑ Perform a raise and lower operation

39

❑ Check fan operation

60

Meters and Drive Checklist

Page

❑ Unused meter disabled by removing gear

76

❑ Correct DRIVER/DRIVEN rate Range

gears installed on meter(s) in use

76

❑ Correct optional flutes for rate Range

a

❑ Variable rate gearbox set per calibration

77

❑ Check contact tire inflation

152

❑ Check chain tension. Re-connect any

loose idler tensioning springs.

154

❑ Master Switch ON

(Variable Rate Kit option)

34

a.

Refer to Seed Rate Chart manual.

Advertising
This manual is related to the following products: