Field operation, Seed monitor – Great Plains NTA2007 Operator Manual User Manual

Page 69

Advertising
background image

Great Plains Manufacturing, Inc.

Table of Contents

Index

Operating Instructions

65

2012-01-05

Table of Contents

Index

166-372M

Field Operation

Perform all steps in “Pre-Start Checklist” on page 34
and “Final Field Checklists” on page 64.

Seed Monitor

The seed monitor performs the following functions:

• Drill lift switch monitoring

• Seed flow blockage

• Fan Speed monitoring

• Hopper material level monitoring

• Hopper air pressure monitoring

• Meter rate monitoring

(seed rate control, optional)

• Ground speed monitoring

Consult the DICKEY-john

®

Air Cart Control manual for

how to configure reporting and alerts.

Do not make short radius turns with the drill in the ground.

Note: If you stop in the middle of a pass, raise the drill

and back up 3m (10 ft) before resumption of
seeding.

Equipment Damage Risk:
On a new drill, check and adjust hopper strap tension before
and after each material load on the first day, then daily
thereafter. Loose straps can result in excess meter oscillation
as hoppers near empty.

First Pass Operation Checklist

Page

Drill unfolded and aligned for first pass,
with opener discs about 3m (10ft) before
field edge.

35

Run fan for at least 15 minutes before
planting.

Unfold marker on next-row side.

Set fan hydraulic circuit to low flow,
engage circuit. Gradually adjust fan
hydraulic flow to obtain 3800 rpm.

87

Check seed monitor for alerts.

a

Pull forward, lower air drill, and begin
planting for a short distance.

Stop. Assess:

• coulter depth

• planting depth

• press wheel operation

Make necessary adjustments

68

a.

Refer to Seed Rate Chart manual.

Sharp Field Turns Checklist

Page

Fold marker

62

Raise air drill

41

Make turn

Unfold marker on next-row side.

62

Lower air drill 3m/10ft before field edge

40

Resume planting.

Suspending Planting Checklist

Page

Stop tractor

Fan hydraulic circuit to Float or Neutral

61

Fold Marker

62

Raise air drill

41

Ending Planting Checklist

Page

Suspend operations as above, then

Lift implement

41

Set tractor for fold

37

Fold wings

37

Set rear beacon switch ON

30

Lower implement to obtain lock

40

Lights ON for transport

Advertising
This manual is related to the following products: