Variable rate (servo) calibration, Servo seeding example: calibration targets, Seeding example; initial calibration screen – Great Plains NTA2007 Operator Manual User Manual

Page 87: Step 36

Advertising
background image

Great Plains Manufacturing, Inc.

Table of Contents

Index

Adjustments

83

2012-01-05

Table of Contents

Index

166-372M

Variable Rate (Servo) Calibration

Note: For drills with manual (crank set) gearboxes, use

the instructions at Calibration for Manual
Gearbox
” on page 80.

Complete step 1 through step 13 beginning on page 78,
and “ACC Re-Configuration” from the Variable Rate
Kit
manual 166-263M. You must have created or
selected a Material that matches the material you are
about to calibrate.

34. Check that final Range gear pairing is the same on:

• the seed rate chart,
• the meter, and
• the Meter gear Range in the Channel Setup.

35. Enter the calibration screen for the Channel

assigned to the meter to be calibrated.

At this time, the linear actuator for that meter’s
gearbox becomes active. The scale indicator moves
to approximately mid-scale, then stops.

Pointing to a specific value is not required, but it
needs to be in the range 30

° to 95°. Great Plains

recommends using a scale setting that is close to
your expected target rate.

Use the Inc+/Dec- softkeys on the monitor console to
adjust the indicator to the seed rate chart Gearbox
Setting value, or at least to within the 30

°-95° range.

36. Manually crank the meter for at least the number of

turns shown in the table at right for

1

10

ha or

1

10

ac.

The exact number of revolutions, cranking rate, and
precise starting and stopping handle angles are not
critical, as the system reads meter revolutions
accurately, and can compensate for shaft speed,
seed size and partial turns.

What matters is getting a large sample, to reduce
errors and increase confidence in the calibration.

Note: By calibrating at or near target rate, and for

1

10

ha,

you establish a comfort level that the drill is set up
correctly, in particular, that you are in the correct
gear Range for the desired application rate.

Note: If no “Variable Cal Const” was selected during

material setup, crank at 1

1

2

revolutions per second

(90 rpm) for most accurate results.

Seeding Example; Initial Calibration Screen:

Servo Seeding Example: Calibration Targets:
Crop: Wheat

Flutes: 2 Stars
Target Rate: 200 kg/ha

Chart Data:
Range: High

Closest Chart Rate: 201.3 kg/ha
Initial Variable Rate Gearbox setting: 62
Initial Calibration Constant: 79197

Parameter

Value

Comment

CHANNEL

1

Example

Material

Wheat HRW

Example

Density

0.79

KG/L

Example

Calibration
Constant

77591

From chart

Target Meter
rpm

20

RPM

Example

# Meter
Revs

30

REV

Example

Pulse Count 0

PUL

Pre-Cal.

New Calib
Const

______

Total #
Towers

4

Per
Implement

Amount
Dispensed

______

KG

From Scale

NTA607 Calibration Crank Revolutions

Revolutions Per

Ltd. Flex

Std. Flex

Hectare

862

855

1/10th hectare

86.2

85.5

32157

NTA2007 Calibration Crank Revolutions

Revolutions Per

Ltd. Flex

Std. Flex

Acre

349

346

1/10th Acre

34.9

34.6

Advertising
This manual is related to the following products: