Install distribution towers, Tower positioning – Great Plains NTA3010 Predelivery Manual User Manual

Page 29

Advertising
background image

Great Plains Manufacturing, Inc.

Setup

27

11/06/2008

160-220M

Install Distribution Towers

Only wing towers need to be installed. Center-section
towers are mounted at the factory.

Refer to Figure 35

56. Position towers

so there is no interference when

wings are folded or unfolded. Install wing towers at
locations shown in Figure 37 (NTA3010) or
Figure 38 (NTA3510) on page 28.

57. Mount the support bracket:

168-362D NTA35 DIST TOWER MOUNT

on the frame using one:

806-069C U-BOLT 1/2-13 X 4 1/32 X 7 1/4

and two sets:

804-015C WASHER LOCK SPRING 1/2 PLT
803-020C NUT HEX 1/2-13 PLT

Tower Positioning

Refer to Figure 36

58. Loosen the two U-bolts

that hold the tower on the

support bracket.

59. Reposition the tower so the bottom of the lower

round plate is about 20

3

4

in (52.7cm) above the

frame. Turn the inlet tube toward the center of the
implement.

60. After towers have been installed and before any

seed hoses are installed, slowly fold the implement
while watching to be sure there is no interference. If
a tower interferes with any part of implement, com-
pletely reposition the tower. Repeat these steps until
implement folds without tower interference.

Figure 35

Tower Support Bracket

16205

31

42

45

32

55

31

32

55

45

42

Figure 36

Tower Orientation

16198

54

54

20

3

4

in

52.7cm

54

Advertising
This manual is related to the following products: