Great Plains NTA3010 Predelivery Manual User Manual

Page 33

Advertising
background image

Great Plains Manufacturing, Inc.

Setup

31

11/06/2008

160-220M

Refer to Figure 42

76. Select one:

816-352C AIR DRILL DD OPNR HOSE BOOT

77. Connect hose boot

to hose

by screwing hose

into hose boot

78. Connect to the seed tube by pushing the boot over

the lip of the seed tube

.

79. Repeat step 70 through step 78 for each Port on the

current Tower, working clockwise around the tower.

80. When hoses have been installed in all ports,

retighten bolts on the tower assembly to secure
hoses.

81. Repeat step 70 through step 80 for each Tower,

moving right. When all hoses have been installed,
check that seed hoses are long enough for wing flex
and short enough to prevent hose damage. Hoses
may need to be removed, shortened and re-inserted.

Figure 42

Hose to Seed Tube

26436

1

59

58

58

58

59

1

Advertising
This manual is related to the following products: