Appendix b - initial and option setup, Post-delivery checklist, Fold / field switch installation – Great Plains NP4000B Operator Manual User Manual

Page 180: Nh3 component replacement dates, Component replacement dates

Advertising
background image

417-199M

Table of Contents

Index

2014-05-14

176

2013+ NP4000/A/B

Table of Contents

Index

Great Plains Manufacturing, Inc.

Appendix B - Initial and Option Setup

This Appendix covers setup tasks performed only once,
or at infrequent intervals. Routine setup tasks are
covered in “Initial Setup” on page 35. Some of the
following items may already have been done by your
Great Plains dealer:

a.

Record replacement dates.

b.

Field lift partial fold adjustment (below)

c.

Flow controller console installation (Option,
page 179)

d.

Frame-mounted row options
(see manual supplied with accessory)

FOLD / FIELD Switch Installation

Refer to Figure 95
Chose a cab location for the FOLD / FIELD switch:

• Within easy reach for periodic field activation.

• Easy to observe periodically to verify state.

• Does not obstruct view of road or important tractor

controls or indicators.

The switch bundle includes an optional fuse kit and both
ring terminals and fuse box terminals for connection to
the tractor’s 12Vdc supply.

The switch may be connected directly to battery power,
or to a switched source. If connected direct, it is
important to use the PARK position to save battery power
when the applicator is connected but not in use.

Route the captive harness to the hitch. Secure it with the
provided cable ties to prevent entanglement and
damage.

NH

3

Component Replacement Dates

Record replace-by dates on the “Replacement Log”,
pages 124 to
126.

If the implement has Great Plains-installed metering,
several components of that system have limited service
lives, and must be replaced before specific dates.

Where these dates are stamped on metal parts, normal
oxidation, and the corrosive effects of extended field
exposure to low levels of anhydrous ammonia vapor, can

Post-Delivery Checklist

1.

Read and understand “Important Safety
Information
” on page 1.

2.

Check that all working parts are moving freely, bolts
are tight, and cotter pins are spread.

3.

Check that all grease fittings are in place and
lubricated. See “Lubrication and Scheduled
Maintenance
” on page 139.

4.

Check that all safety decals and reflectors are
correctly located and legible. Replace if damaged.
See “Safety Decals” on page 9.

5.

Inflate tires to pressure recommended and tighten
wheel bolts as specified. See “Tire Inflation Chart
on page 159.

Figure 95

Install FOLD / FIELD Switch

349zz

Figure 96

REP (Replace-By) Date on Valve

31635

Advertising
This manual is related to the following products: