Field set-up checklists – Great Plains NP4000B Operator Manual User Manual

Page 84

Advertising
background image

80

2013+ NP4000/A/B

Table of Contents

Index

Great Plains Manufacturing, Inc.

417-199M

Table of Contents

Index

2014-05-14

Field Set-Up Checklists

Use the following tables to develop a final checklist for
your tractor/fertilizer applicator configuration. Additional
or fewer steps may be necessary depending on tractor
features, fertilizer applicator options and planting
accessories.

Mechanical Checklist (Tractor Hitching) Page

Fertilizer Applicator hitched

36

Parking Stands stowed

42

Electrical Checklist

Page

Verify electrical hookups solid

40

Turn optional console POWER switch to
ON. Check console and observe any
diagnostic messages

a

a. Refer to console manual.

Hydraulic System Checklist

Page

Check tractor hydraulic reservoir full

-

Make hydraulic connections

41

Inspect connections for leaks

-

Perform a raise operation
(leave transport locks in)

51

Unfold Applicator

56

Row Units Checklist

Page

Check row cleaner setup (Option)

88

Check tubing connections to tines

-

NH

3

: Check tine outlet behind shoes

NH

3

: Check shoe condition

NH

3

: Check tine shoes all at same height

NH

3

: Check tine shank alignment

Liq: Check outlet behind arms

-

Check coulter blade condition

-

Check coulter depth

90

Check NH

3

sealer adjustments

87

Check spider condition

Mechanical Checklist (post-Hitching)

Page

Remove wing lock pins

50

Fully raise applicator

52

Unfold wings

56

Remove lift-assist locks

50

Install spacers

43

Check front-to-rear level

43

Check side-to-side level

91, 136

Set application height

89

NH

3

System Checklist (Cart Unhitched)

Page

Shut-off rope routed to tractor cab

39

Emergency shut-off valve closed

61

On/off solenoid valve closed

61

Control valve closed

61

Console POWER switch off

61

All bleed valves closed (3 or more)

62

Breakaway coupler mated (visual check)

62

All hydrostatic relief valve caps seated

62

Plumbing System Checklist

(Prior to Tank Connection)

Page

Liq: Orifice plate size matches rate

100

Fittings all secure

-

Liq: Relief valve adjusted

103

Liq: Pump rate set

103

Liq: Strainer recently cleaned

129

Liq: Inlet shut-off valve closed

30

Mechanical Checklist (Cart Hitching)

Page

Nurse tank hitched

76

Hitch pin locked

Safety chains secured

76

Advertising
This manual is related to the following products: