Field operation checklists – Great Plains NP4000B Operator Manual User Manual

Page 86

Advertising
background image

82

2013+ NP4000/A/B

Table of Contents

Index

Great Plains Manufacturing, Inc.

417-199M

Table of Contents

Index

2014-05-14

Field Operation Checklists

Perform all steps in “Pre-Start Checklist” on page 48
and “Field Set-Up Checklists” on page 80. The
applicator is presumed to be unfolded and raised.

Note: These are merged anhydrous (NH

3

) and

conventional liquid (Liq) lists. NH

3

/Liq: refer to

material-specific operations. Some steps may
refer to Optional equipment.

First Pass Operation Checklist

Page

1

Raise fertilizer applicator.

51

2

Unfold, if not already unfolded.

56

3

Line-up at pass start per plan.

-

4

Pull forward and stop.

-

5

Check console
POWER switch ON,
BOOMS

a

switch(es) ON and

MASTER switch OFF

79

6

NH

3

: Re-check all line valves and bleed

valves closed.

67

7

NH

3

: Open tank withdrawal valve.

Check for zero releases.

67

8

NH

3

: Open applicator emergency shut-off

valve. Check for zero releases.

67

9

NH

3

: Open nurse tank hose inlet valve

(if any). Check for zero releases.

68

10 NH

3

: Open nurse tank hose outlet valve

(if any). Check for zero releases.

68

11 Liq: Open tank supply hose outlet valve.

33

12 Liq: Open applicator supply inlet shut-off

valve.

30

13 NH

3

: Check meter pressure gauge

matches tank pressure gauge.

68

14 NH

3

: Enter tractor cab.

Check ropes present with nominal slack.

79

15 Console (Option):

POWER on
MASTER on
RATE as desired

79

16 Lower applicator:

a. hitch (lower, then Depth Control)
b. cab switch to FIELD
c. wings (extend, then low rate continuous

extend)

55

17 Begin first pass, setting switch

MASTER to ON.

79

18 Liq: Hydraulic remote for hydraulic pump

to preset

77

19 Monitor the console (Option) for expected

reports of application rate/speed, and any
alarms.

-

20 Periodically check the applicator gauges

for expected pressures and temperatures.

-

21 Pay attention to odors. Watch for leaks.

-

a. BOOM 1, or BOOM 1,2,&3 (section control)

Pass Turn

a

Operation Checklist

a. Monitor flow divider pressure during end-of-pass

operations and turns. Adjust operations as needed
if true zero pressure is desired.

Page

1

Set console MASTER switch OFF some
distance before end of pass, or stop at
end of pass.

69

2

NH

3

: To minimize vapor release, wait for

flow divider pressure gauge to read zero
during final pass distance or while waiting
at end of pass.

51

3

While slowing at end of pass, or stopped

-

4

b

b. These steps are for a full stop prior to a turn. If the

lift is conducted while in motion, the exact order of
hitch and lift-assist raising is not critical. The
objective is to avoid any reverse motion of tines.

Fold and lift (to partially fold wings)

53

5

b

Raise 3-point hitch

-

6

Turn up-wind if possible.
Turn slowly to avoid tank cart upset.
Do not turn too tightly.

69

7

Make turn. Line up for next pass.

8

Lower applicator (same as step 16) for
First Pass, at left.

9

Begin pass, setting switch

MASTER to ON.

79

10 Begin next pass

First Pass Operation Checklist

Page

Advertising
This manual is related to the following products: