Start-up checklist – Carrier 48TM016-028 User Manual

Page 60

Advertising
background image

Manufacturer reserves the right to discontinue, or change at any time, specifications or designs without notice and without incurring obligations.

Catalog No. 04-53480016-01

Printed in U.S.A.

Form 48TM-4SI

Pg CL-1

3-06

Replaces: 48TM-3SI

Book

1

4

Tab

1a 6a

Copyright 2006 Carrier Corporation

-

--

------

-----

------

-----

------

-----

------

------

-----

------

-----

------

-----

------

------

-----

------

-----

------

-----

------

-----

---

---

------

-----

------

-----

------

-----

------

----

------

------

-----

---

CUT

AL

O

N

G

D

O

T

T

E

D

L

INE

CUT

AL

O

N

G

D

O

T

T

E

D

L

INE

START-UP CHECKLIST

PRE-START-UP

VERIFY THAT ALL PACKING MATERIALS HAVE BEEN REMOVED FROM UNIT

VERIFY INSTALLATION OF INDOOR FAN MOTOR ADJUSTMENT BOLT AND PLATE

VERIFY INSTALLATION OF OUTDOOR-AIR HOOD

VERIFY INSTALLATION OF FLUE HOOD AND WIND BAFFLE

VERIFY THAT CONDENSATE CONNECTION IS INSTALLED PER INSTRUCTIONS

VERIFY THAT ALL ELECTRICAL CONNECTIONS AND TERMINALS ARE TIGHT

CHECK GAS PIPING FOR LEAKS

CHECK THAT FILTERS AND SCREENS ARE CLEAN AND IN PLACE

VERIFY THAT UNIT IS LEVEL

CHECK FAN WHEEL AND PROPELLER FOR LOCATION IN HOUSING/ORIFICE, AND VERIFY SETSCREW

IS TIGHT

VERIFY THAT FAN SHEAVES ARE ALIGNED AND BELTS ARE PROPERLY TENSIONED

VERIFY THAT SCROLL COMPRESSOR IS ROTATING IN THE CORRECT DIRECTION

VERIFY THAT CRANKCASE HEATER HAS BEEN ENERGIZED FOR 24 HOURS

START-UP

ELECTRICAL

SUPPLY FAN AMPS

EXHAUST FAN AMPS

TEMPERATURES

OUTDOOR-AIR TEMPERATURE

F DB (Dry-Bulb)

RETURN-AIR TEMPERATURE

F DB

F WB (Wet-Bulb)

COOLING SUPPLY AIR

F

GAS HEAT SUPPLY AIR

F

PRESSURES

VERIFY REFRIGERANT CHARGE USING CHARGING CHART ON PAGE 45.

GENERAL

ECONOMIZER MINIMUM VENT AND CHANGEOVER SETTINGS TO JOB REQUIREMENTS

MODEL NO.:

SERIAL NO.:

DATE:

TECHNICIAN:

SUPPLY VOLTAGE

L1-L2

L2-L3

L3-L1

COMPRESSOR AMPS — COMPRESSOR NO. 1

L1

L2

L3

— COMPRESSOR NO. 2

L1

L2

L3

GAS INLET PRESSURE

IN. WG

GAS MANIFOLD PRESSURE STAGE NO. 1

IN. WG

STAGE NO. 2

IN. WG

REFRIGERANT SUCTION

CIRCUIT NO. 1

PSIG

CIRCUIT NO. 2

PSIG

REFRIGERANT DISCHARGE CIRCUIT NO. 1

PSIG

CIRCUIT NO. 2

PSIG

Advertising