Water deflector, Structural silicone glazed mullion, Step 3) – EFCO 960 Series User Manual
Page 49: Step 4), Fig. # 44, Fig. # 43, Screw spline / shear block installation

PAGE 47
WATER DEFLECTOR
sealant (D.C.795).
of silicone type
Apply a continuous bead
STEP 4)
A silicone type sealant should be applied after the continuous
L126
water deflector is installed.
TYP. INTERMEDIATE
HORIZONTAL MEMBER
FIG. # 44
DEFLECTOR
THEN ROTATE IN
WATER
STEP 3)
gasket race and spread the legs slightly.
Hook the "V" over the edge of the
See Fig. # 46 on page 48 for the deflector end notching.
divert any water to the verticals or to the weep holes.
horizontals must include a continuous water deflector to
With the exception of the head and sill, all intermediate
L126
FIG. # 43
1st.
SPREADING LEGS
PRESS DOWN
2nd.
3rd.
HORIZONTAL MEMBER
TYP. INTERMEDIATE
JDA 10/2000
[1" Glazing]
INSTALLATION OF WATER DEFLECTOR AND
SETTING CHAIR / BLOCK
SECTION VIII C -
SCREW SPLINE / SHEAR BLOCK
INSTALLATION