Interior relative humidity, Inadequate separation bet, Condensation" brochure – EFCO 960 Series User Manual
Page 62: Involved, Fig. # 67, Fig. # 66, Structural silicone, Glazed mullion
Advertising

OTHERS SIMILAR.
L126 SHOWN,
FRONT
JDA 3/2002
FIG. # 67
S.S.G. MULLION AND SEAL
SHOULD BE LOCATED
THE ENDS COMPLETELY.
C
L
BACK
AT QUARTER POINTS
IF A SPLICE JOINT IS REQUIRED
LOCATE IT 6" AWAY FROM THE
NOTE:
horizontal to horizontal.
C
L
SETTING BLOCKS
CHAIR/BLOCK
SETTING
FIG. # 66
TRIM THIS
SECTION
END NOTCH AT JAMBS
#9662 & #9663 SIMILAR.
THE DART OF THE MULLION.
SEE PAGE 47 FOR SEALING
THE WATER DEFLECTOR TO
and seal completely from
deflector as shown below,
Notch the water
AND VERTICAL INTER.
#9635 SHOWN,
THE WATER DEFLECTOR RUNS THROUGH AT THE MULLION.
STRUCTURAL SILICONE
INSTALLATION OF THE WATER DEFLECTOR AT A S.S.G. MULLION
SECTION IX -
SEE PAGE 48 FOR
GLAZED MULLION
PAGE 60
CONT.
960 WALL
1.750
.150
Advertising