Horizontal-fabrication – Oldcastle BuildingEnvelope Reliance StormMax High Performance User Manual

Page 11

Advertising
background image

February 2014

09-Horizontal-Fabrication

1-866-Oldcastle (653-2278) www.oldcastlebe.com

1.5 a. Cut all Horizontal members as follows:

HW-710 Horizontal to D.L.O.

HW-701 Head, HW-702 Sill, HW-732 Roll Over Horizontal, HW-733 Roll

Under Horizontal, HW-737 Filler to D.L.O. minus 1/16"

b. Drill (2) #11 - .191" holes and counter sink locate 3/4" from each end at "V" grooves

c. Slide FG-5185 Spacer Gasket into reglet on all Horizontal members cut to D.L.O. size as

shown in FIGURE 1.5b

D.L.O.

HW-710 Horizontal Mullion, (HW-701 Head,

HW-732 Roll Over Horizontal, HW-733 Roll

Under Horizontal HW-737 Filler and

HW-702 Sill will have the same fabrication

except D.L.O minus 1/16")

3/4"

Drill (2) #11 - .191" holes and

counter sink. Locate .75" from

each end of member.

D.L.O.

FG-5185

Spacer Gasket

FIGURE 1.5a

FIGURE 1.5b

HORIZONTAL MEMBER FABRICATION

RELIANCE STORMMAX HIGH PERFORMANCE INSTALLATION MANUAL

Advertising