Mullion-fabrication – Oldcastle BuildingEnvelope Reliance StormMax High Performance User Manual

Page 9

Advertising
background image

February 2014

07-Mullion-Fabrication

1-866-Oldcastle (653-2278) www.oldcastlebe.com

FIGURE 1.3

1.3 a. Prior to HW-185-01 Shear Block attachment insert HW-202-01 Anchor Sleeves at

HW-710 Vertical Mullion ends and match drill .191 dia. hole.

b. Attach HW-185-01 Shear Block to HW-710 Vertical Mullion with FS-9 fastener.

c. Install FG-5185 interior spacer gasket cut to 2" from ends and 2" gaps at horizontal to

allow for HW-355 Zone Plugs. (Not applicable on Dry Glazed applications)

d. Install and seal HW-345 End Caps to top and bottom of HW-710 Vertical Mullion

screw boss with (2) FS-320 #10 x 1/2" drive screw .

HW-202-01 Anchor Sleeve

HW-710 Intermediate Vertical Mullion

HW-185-01 Shear Block

(4) FS-9 Fasteners

HW-345 Mullion End Cap

FG-5185 Interior Spacer Gasket

(Not applicable on Dry Glazed

applications)

Seal and tool sealant on end caps

2"

Gap dimension for

WW-355 Zone Plug

Apply sealant bed to front edge

of mullion end prior to installation

of HW-345 Mull Cap

(2) FS-320 Drive Screw

VERTICAL MULLION FABRICATION

RELIANCE STORMMAX HIGH PERFORMANCE INSTALLATION MANUAL

Advertising