Isolator-install-dry-glaze – Oldcastle BuildingEnvelope Reliance StormMax High Performance User Manual

Page 22

Advertising
background image

February 2014

20-Isolator-Install-Dry-Glaze

1-866-Oldcastle (653-2278) www.oldcastlebe.com

DRY GLAZED GASKET INSTALLATION (OPTIONAL)

3.1 a. Cut vertical GP-165 Gasket to D.L.O. plus 1 1/2".

b. Cut the horizontal GP-165 Gasket to D.L.O. plus 3/16".

c. Bed 2" at horizontal vertical intersections including the gasket reglet with sealant as shown in Figure 3.1a.

d. Install vertical GP-165 Gasket into reglet using a vinyl roller. Begin at center work towards ends.

e. Install horizontal GP-165 Gasket next. Apply silicone on ends. Begin at center of horizontal.

Use a vinyl roller to ensure proper engagement.

2"

2"

HW-500 Horizontal

GP-165 Dry Glazed Gasket

Apply Dow Corning 795

to seal gasket joint

Apply Dow Corning 795 or Tremco Proglaze

SSG sealant and push gasket in to reglet

then use roller to properly engage the gasket

FIGURE 3.1a

FIGURE 3.1b

RELIANCE STORMMAX HIGH PERFORMANCE INSTALLATION MANUAL

Advertising