Jamb-mullion-installation – Oldcastle BuildingEnvelope Reliance StormMax High Performance User Manual

Page 15

Advertising
background image

February 2014

13-Jamb-Mullion-Installation

1-866-Oldcastle (653-2278) www.oldcastlebe.com

2.0 a. Insert "F" or"T" Anchor into the top and bottom of the

mullions before erecting them as shown in FIGURE 2.0a.

b. Erect and locate jamb and vertical mullions and

temporarily attach them to structure. (Install plumb & true)

c. Field Drill holes in "F" or "T" Anchor for appropriate

fastener according to approved shop drawings.

d. Shim and Anchor into opening.

e. Apply Dow Corning 795 or Tremco Proglaze SSG silicone

sealant to face, top, bottom and screw tracks of shear block

as shown in FIGURE 2.0b.

Apply Dow Corning 795

or Tremco Proglaze SSG

silicone sealant to face, top

bottom and screw tracks of

shear block as shown

Field Drill Typical

Field Drill Typical

JAMB AND MULLION INSTALLATION

FIGURE 2.0b

FIGURE 2.0a

RELIANCE STORMMAX HIGH PERFORMANCE INSTALLATION MANUAL

Advertising