Door-installation – Oldcastle BuildingEnvelope Reliance StormMax High Performance User Manual

Page 29

Advertising
background image

February 2014

27-Door-Installation

1-866-Oldcastle (653-2278) www.oldcastlebe.com

3.7 All door framing components are shipped fabricated from the factory. The main curtain wall framing can be

erected prior to installing the doors. Refer to FIGURE 3.7 for door header fabrication and installation

instructions.

a. Curtain wall verticals and door subframes run through to finished floor. Bed adjacent curtain wall verticals

in sealant and anchor to floor per approved shop drawings. See shop drawings for anchoring door

jamb mullion.

b. SUBFRAME INSTALLATION:

b.1 Assemble Door Subframe including TH-57 Threshold.

b.2 Install subframe into curtain wall frame. Shim plumb and true.

b.3 Anchor subframe with FS-322 space 18" O.C. Anchor threshold per shop drawings

b.4 Install door stops in subframe. The vertical stops run through.

b.5 Mask off frame with painter's tape and clean & seal perimeter of frame on exterior & interior

b.6 Install door per DOOR & FRAME INSTALLATION & GLAZING MANUAL.

ENTRANCE SUBFRAME INSTALLATION

FIGURE 3.7

Attaching Subframes

HW-500 Mullion

1/8" Shim Space

FS-322 Fastener 18" O.C.

D-226 Subframe

FG-5163 Door Stop

HW-122 Pocket Filler

Seal joint between vertical and

horizontal subframes

1/8" Shim Space

D-231 Door Head

RELIANCE STORMMAX HIGH PERFORMANCE INSTALLATION MANUAL