Fig. 277: hardy control-link float out/ word 4 – Hardy HI 3010 Filler/Dispenser Controller User Manual

Page 95

Advertising
background image

81

Network
Installation

FIG. 272: HARDY CONTROL-LINK FLOAT OUT/

WORD 2 SELECTED AS DESTINATION

Step 16. Click on the “Jump to Sources Page” button. Map-

ping Setup 2 appears.

Step 17. Click on the Process Data pull down list. (See Fig.

273)

FIG. 273: MAPPING PAGE 2 SELECTING NET

WEIGHT

Step 18. Click on Net Wt. Net Wt appears in the Process

Data field with Chan 1 to the right. (See Fig. 274)

FIG. 274: PROCESS DATA/SELECTING NET

WEIGHT/CHANNEL 1

Step 19. Click on the Select button. Net Weight/Channel 1

(HFI8) appears in the Current Mappings field to the
right of the Hardy Control-Link Float Out selection
(EFO2).

FIG. 275: CURRENT MAPPINGS/NET WEIGHT/

CHANNEL 1 (HFI8) ASSIGNED TO HARDY

CONTROL-LINK FLOAT OUT (EFO2)

Step 20. Click on the Map button to map the assignment

statement. (See Fig. 275)

FIG. 276: NET WEIGHT ASSIGNED TO HARDY

CONTROL-LINK FLOAT OUT

Step 21. Click on the left arrow to return to Page 1.
Step 22. Click on the Network pull down list and select

Hardy Control-Link Float Out again.

Step 23. This time type the number “4” in the Word field.

(See Fig. 277)

NOTE:

Remember the Items in the Host Message on the
OPC Server consist of two words.

FIG. 277: HARDY CONTROL-LINK FLOAT OUT/

WORD 4

Step 24. Click on the Select button. Hardy Control-Link

Float Out Word 2 (EFO4) appears in the Current
Mappings field.

FIG. 278: HARDY CONTROL-LINK FLOAT OUT/

WORD 4 SELECTED AS DESTINATION

Step 25. Click on the “Jump to Sources Page” button. Map-

ping Setup 2 appears.

Step 26. Click on the Process Data pull down list. (See Fig.

279)

Advertising