AERCO SmartPlate User Manual

Page 70

Advertising
background image

SmartPlate Installation, Operation & Maintenance Manual

CHAPTER 8 – CORRECTIVE MAINTENANCE

Page 70 of 138

AERCO International, Inc.

 100 Oritani Dr.  Blauvelt, NY 10913

OMM-0069_0E

PRI: 11/26/2013

Phone: 800-526-0288

SP-100

Figure 8-11. Insertion of Plates in Heat Exchanger

8.7.3 CLOSING HEAT EXCHANGER

Closing the Heat Exchanger is accomplished as follows:

1. Check that all the sealing surfaces (i.e. surfaces in contact with the heat transfer medium)

are clean.

2. Check that connection fittings are in position and are in good condition.

3. Clean and lubricate the sliding surfaces of the upper and lower support bars.

4. If the plates are correctly assembled, the edges form a

honey comb" pattern as shown

below.

.

5. Slide the pressure plate forward and press the plates together (Figure 8-12). If the plate

pack was previously marked on the outside (Figure 8-8), check to ensure that the plate
arrangement agrees with the markings.

Advertising