6,f8a0,77 4, J1j cominunications procedure, Operations – Toshiba LF494 User Manual

Page 130: Toshiba

Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".

Advertising
background image

TOSHIBA

6 , F 8 A 0 , 7 7 4 .

J1J Cominunications Procedure

Basic opcralions of ihe AF UK) terminal are as follows. Sec Ihe inKlruction manual

of Ihc AFIOO terminal for details.

[Procedure]

[Operations]

Making sure Ihe probe cable of ihc AFIOO is coimcolcd to the

flowmeter output line, turn on the power of the AFIOL).

After the initial display, date and time selling display appears.

Filter the current date and time, and press [ENTER].

Press [ENTER] only for dale and lime not to be changed.

Function menu appears. Select [K1 : Sensor],

Data transmission starts. Various flowmeter data will be

transmitted to ihc AFIOO.

Select whether you wish to change/ write data to the flowmeter

or simply read data from the flowmeter:

* Press [YES] and [ENl'ER] to change/write data; or

• Press [NO] and [ENTER] to read data only.

Operation menu appears. Select the de.sired operation item,

The data of the sclccicd operation item appears.

To change data, press [SRT], enter new tiata, and press

[ENTER]. The new data will be transmitted to the flowmeter.

Then the new data appears on the AFIOO. Make sure the data i,s
correct.

When all the operations arc completed, press [ESC] as

many times as necessary to return to the operation menu.

Tlien remove the AFIOO probe cable from the flowmeter
output line and turn off the power of the AF100.

NOTES

L

2

.

Pressing [ESC] cominnou.sly, the system goes back to ‘"Write proicci/permit.”.

Pressing [HOME] continuously, the system goes back to “Function menu.''

-

1 2 9

-

Advertising
This manual is related to the following products: