5.3 External Staging Control Wiring

WARNING

Improper field wiring may result in fire or explosion

which can cause property damage, severe injury,

or death. Make only wiring connections which are

in accordance with the Installation and Operation

manual.

AVERTISSEMENT

Un câblage incorrect lors de l’installation peut

causer un incendie ou une explosion pouvant

entraîner des dommages matériels, de graves

blessures ou la mort. Ne faire seulement que les

connexions conformes au Manuel d’installation et

d’exploitation.

The wiring methods in this section must be

used to connect an external staging control, such as a

multiple boiler control, building automation system,

energy management system, etc.) Other wiring

methods may be unsafe.

Figure 15

shows how to wire the external

controller to the Pennant’s field wiring panel, which is

located on the right side of the Pennant.

Most of the time, the number of stages from the

external control will match the number of stages on the

Pennant. However, in some instances, the controller

will not have enough staging capability to work with

all of the stages on a Pennant unit (for instance, using

an 8-stage external control with four 4-stage Pennant

units.) In these instances, it is very important to follow

the instructions in this section

Figure 15

shows how

to combine stages on the Pennant for those instances

when the external controller cannot control all the

stages available.

NOTE: The only time Pennant stages should be

jumpered is when the Pennant has an external control,

and the Pennant is used in Mode 6. In all other

modes, when the Pennant controls its stages, the

terminals shown in

Figure 15

must NOT be jumpered.