Vermont castings, majestic products: dvr33, Vertical through-the-roof installation – Vermont Casting DVR33 User Manual

Page 19

Advertising
background image

19

Vermont Castings, Majestic Products: DVR33

10004920

11"

11"

Attic Insulation
Shield

Upper Floor

Ceiling
Installation

Joist

Nails (4)

Firestop
Spacer

FP1029

Fig. 32 Attic insulation shield and firestop spacer.

Typical
Roof
Support
Application

Typical Ceiling
Support
Application

FP1184

Fig. 32 Venting supports.

Min.
2’ (610 mm)

FP1189

Fig. 33 Minimum termination to roof clearance.

(3) #5
Sheet Metal
Screws
per Joint

Sealant

Storm
Collar

TWL101a

Fig. 34 Roof flashing.

1. Locate your fireplace.

2. Plumb to center of the (4”) flue collar from ceiling

above and mark position.

3. Cut opening equal to 9

3

/

8

” x 9

3

/

8

” (240 mm x

240 mm).

4. Proceed to plumb for additional openings through

the roof. In all cases, the opening must provide a
minimum of 1 inch clearance to the vent pipe, i.e.,
the hole must be at least 9

3

/

8

” x 9

3

/

8

1 (240 mm x

240 mm).

5. Place fireplace into position.

6. Place firestop(s) #7DVFS or Attic Insulation Shield

#7DVAIS into position and secure (Fig. 32).

7. Install roof support (Fig. 33) and roof flashing,

making sure upper flange is below the shingles
(Fig. 34).

8. Install appropriate pipe sections until the venting is

above the flashing (Fig. 34).

9. Install storm collar and seal around the pipe.

10. Add additional vent lengths for proper height

(Fig. 33).

11. Apply high temperature sealant to 4” and 7” collars

of vertical vent termination and install.

If a room is above ceiling level, a firestop
spacer must be installed on each level
(top and bottom) of the ceiling joists.
If an attic is above ceiling level, a 7DVAIS
(Attic Insulation Shield) must be
installed. Always face the enlarged ends
of the vent section downward.

Vertical Through-the-Roof Installation

(3) #5
Sheet Metal
Screws
per Joint

Sealant

Storm
Collar

Advertising