3 getting started, Toolbox installation, Inserting and removing test modules – EXFO FTB-8500 Series for FTB-500 User Manual

Page 23: Turning the unit on, 3getting started, Aution, Arning

Advertising
background image

Ethernet and Fibre Channel Application

9

3

Getting Started

If the Ethernet and Fibre Channel Application has been purchased at the
same time as the FTB-500, the Ethernet and Fibre Channel Application
module is pre-installed with the appropriate /ToolBox software version.

ToolBox Installation

ToolBox is the baseline software and thus needs to be installed on the
FTB-500 before using the Ethernet and Fibre Channel Application module.

Note: Refer to the FTB-500 platform user guide for more information on ToolBox

installation procedure.

Inserting and Removing Test Modules

Note: Refer to the FTB-500 platform user guide for more information on how to

insert a module into the FTB-500 or to remove a module from the FTB-500.

Turning the Unit On

Turn on the FTB-500. Refer to the FTB-500 platform user guide for more
information.

C

AUTION

Never insert or remove a module while the FTB-500 is turned on.
This will result in immediate and irreparable damage to both the
module and unit.

W

ARNING

When the laser safety LED (

) is flashing on the FTB-500, at least

one of your modules is emitting an optical signal. Please check all
modules, as it might not be the one you are currently using.

Advertising
This manual is related to the following products: