7 boiler fixing, 1 wall hanging bracket, 2 boiler hanging – Glow-worm Flexicom hx User Manual

Page 17

Advertising
background image

17

Diagram 7.1

14806

7 Boiler Fixing

7.1 Wall Hanging Bracket

The Wall Hanging Bracket is supplied in the main boiler

packaging.
Reposition the wall template over the flue hole and mark

the position of the fixing holes for the hanging bracket, see

diagram 7.1.
NOTE: Due to the varied site conditions we do not supply

fixings and advise that the installer should supply those which

are suitable.
Drill fixing holes and insert suitable wall plugs.
Direct Rear Flue only - If external access is not available the

flue to be used should be assembled as described in sections

10.11 to 10.13 and inserted through the hole in the wall before

fitting the wall hanging bracket.

7.2 Boiler Hanging

IMPORTANT: With regards to the Manual Handling

Operations, 1992 Regulations, the following lift operation

is deemed to be a one man lift, refer to section 17 Manual

Handling.
IMPORTANT: Direct Rear Flue only - The direct rear flue

must be fitted before hanging the boiler, refer to sections

10.11 to 10.13, and the rear outlet cover plate should be

removed.
Lifting the boiler into position, lean the top of the boiler slightly

to the wall and position just above the hanging bracket. Lower

the boiler slowly, push back and engage onto the hanging

bracket making sure the boiler is located over the retaining

bosses, secure with screw provided, see diagram 7.2.

Diagram 7.2

14807

SECURING

SCREW

Advertising