12 commissioning, 7 heating system, 8 completion – Glow-worm Flexicom hx User Manual

Page 40: 9 instruct the user, 6 range rating

Advertising
background image

40

12 Commissioning

Additionally the safe nominal maximum heat input of the

appliance can be achieved at an inlet pressure down to

15mbar.
NOTE:

The

BURNER PRESSURE cannot be measured.

Gas Rate

Make sure that ALL other gas burning appliances and pilot

lights are off.

Check the gas rate using the gas meter test dial and stop

watch, at least 10 minutes after the burner has lit.

The approximate maximum gas rates are:

12.7 Heating System

Ensure that the external controls are calling for heat.

Fully open all radiator valves, flow control valve and bypass

valve if fitted.

Balance the radiators as required and if fitted adjust flow

control valve to give the required system differential. Turn off

all radiators that can be shut off by the user and check to see

if less than the maximum differential allowed of 20

0

C can be

achieved across flow and return.

NOTE: Allow the system to reach maximum temperature then

switch off the boiler by isolating from the electrical supply.

Drain the entire system rapidly whilst hot, using the drain tap

at the lowest part of the system. Fill and vent the system as

described previously in section 12.2

Lock or remove the handle from controls valve, if fitted.

Adjust the boiler temperature controls and any system

controls to their required settings.

12.8 Completion

Ensure that the magnetic lighting instruction label is placed on

the surface of the boiler casing.

GB: It is a requirement that the “Benchmark” Installation

Commissioning and Service Record is completed and left wth

the user.

IE: it is necessary to complete a “Declaration of Conformity” to

indicate compliance to I.S.813. An example of this is given in

the current edition of I.S.813.

12.9 Instruct the User

● Demonstrate, then instruct the User about the lighting

procedure and heating system controls operation.

● Advise that to ensure the continued efficient and safe

operation of the boiler it is recommended that it is checked

and serviced at regular intervals. The frequency of servicing

will depend upon the installation conditions and usage, but in

general, once a year should be enough.

● Draw attention, if applicable, to the current issue of the Gas

Safety (Installation and Use) Regulations, Section 35, which

imposes a duty of care on all persons who let out any property

containing a gas appliance in the UK.

● The user shall not interfere with or adjust sealed

components.

● It is the Law that any servicing is carried out by a

competent person approved at the time by the Health and

Safety Executive.

● Advise the user that, like all condensing boilers this

appliance will produce a plume of condensation from the flue

terminal in cool weather. This is due to the high efficiency and

hence low flue gas temperature of the boiler.

● Advise the user of the precautions necessary to prevent

damage to the system, boiler and the building, in the event of

the heating system being out of use during frost or freezing

conditions.

● Advise the user that the permanent mains electrical supply

SHOULD NOT be switched off, as the built in frost protection

and pump saver program will not operate.

● Advise the User if the mains electricity and gas are to be

turned off for any long periods during severe weather, it is

recommended that the whole system, including the boiler,

should be drained to avoid the risk of freezing.

NOTE: Sealed System: Contact your installation/servicing

company as draining, refilling and pressurising MUST be

carried out by a

competent person approved at the time by

the Health and Safety Executive.

● Leave these instructions and the ‘Benchmark’ Installation,

Commissioning and Service Record with the user.

kW

m3/hr

ft3/hr

kW

m3/hr

ft3/hr

35

3.7

131

22

2.3

81.2

34

3.6

127

21

2.2

77.7

33

3.5

124

20

2.1

74.2

32

3.4

120

19

2.0

70.6

31

3.3

117

18

1.9

67.1

30

3.2

113

17

1.8

63.6

29

3.1

109.5

16

1.7

60.0

28

3.0

106

15

1.6

56.5

27

2.9

102.4

14

1.5

53.0

26

2.8

98.9

13

1.4

49.5

25

2.6

91.8

12

1.3

45.9

24

2.5

88.3

11

1.2

42.4

23

2.4

84.8

10

1.12

38.9

14249

APPROXIMATE GAS RATES

MODEL NATURAL GAS G20

m3/h

ft3/h

12hx

1.28

45

15hx

1.60

56.5

18hx

1.93

68

24hx

2.58

91

30hx

3.26

115

35hx

3.8

134

12.6 Range Rating

The boilers are fully modulating, therefore it is not necessary

to range rate them, however, if desired, you can adjust the

boiler in 1kW increments between 10 and maximun output of

your appliance, as follows:

a) Press and hold the ‘MODE’ and “+” button for 5

seconds. The display will change to flashing ‘0’.

b) Use the ‘+’ or ‘-’ button to scroll to 96.

c) Press and hold ‘MODE’ 5 seconds to confirm.

d) The display now shows a flashing ‘d. 0’.

e) The part load setting is displayed in kW.

Press ‘MODE’ the max rate will be indicated, to

change the value to the desired setting, use the ‘+’

or ‘-’ button.

f) Press ‘MODE’ for 5 sec to confirm the new setting

has been saved.

g) Press and hold ‘MODE’ and “+” to exit.

Advertising