SpectraCal EIZO ColorEdge User Manual

Page 7

Advertising
background image

17544 Midvale Avenue N., Suite 100, Shoreline, WA 98133 USA

Corporate: +1 206 420 7514 | Tech Support: +1 206 457 8949 |

www.spectracal.com

8. Click OK.

Upon completion of the AutoCal 3D hardware LUT calibration process, CalMAN automatically loads the
optimized 17x17x17 LUT calibration data into the EIZO monitor.

Note: Once an optimized 3D LUT has been loaded into an Eizo monitor, there is no need for, or
advantage to, creating an ICC profile for the monitor.

5. Display Validation section
When the cube calibration completes, CalMAN automatically loads the optimized 17x17x17 LUT
calibration data into the EIZO monitor. You can test the performance of the monitor, in the Display
Validation
section of the Color Cube workflow, to verify the accuracy of the monitor when using the 3D
calibration LUT. You can switch back to the Gamma & ColorChecker Pre-Test page to compare to the
pre-calibration performance.

DONE – You are done with the 3D LUT monitor calibration for an EIZO monitor that is normally
connected to a computer’s standard graphics adapter output.

Advertising