Vortech 2006-2010 6.1L Hemi Cars (Charger, Challenger, Magnum, 300C) User Manual

Page 29

Advertising
background image

P/N: 4CL020-010 v6.0, 02/28/2012

©2012 Vortech Engineering, Inc

All Rights Reserved, Intl. Copr. Secured

15

10. SUPERCHARGER DISCHARGE ASSEMBLY INSTALLATION

A. Attach the straight supercharger discharge tube

to the supercharger using the supplied ø2.75”

90º elbow per Fig. 10-a.

B. Attach the other end to the CAC inlet using

the supplied ø2.75 x 3” sleeve and #44 hose

clamps.

C. Install the supplied bypass valve onto the barb

on the discharge tube using 1” hose and point it

towards the rear of the vehicle. Install the sup-

plied 1” air filter on the bypass valve discharge.

(See Fig. 10-b).

D. Connect 5/32” vacuum line from the bypass valve

to the tee fitting installed in the brake booster

hose in step 3M or 3N. Locate the 5/32” tee in

the Fuel Pump Voltage Booster assembly and

install inline for use in a later step.

E. (6.1L engine only) Re-install the passenger

side plastic engine cover. In order to provide

room for the charge cooler, remove the oil fill

cap, transfer the o-ring on the factory oil fill cap

to the supplied oil fill cap and install the supplied

oil fill cap.

F. (5.7L engine only) Cut off the driver side

portion of the engine cover leaving only a thin

portion (~3/4”) extending beyond the colored

insert. Loosen the intake manifold bolt and in-

stall the supplied “engine cover lower bracket”

(see Fig. 10-c).

G. (5.7 engine only) Remove a nut from the

driver side rear corner of the colored insert and

install the “upper engine cover bracket” (See fig.

10-d).

H. (2009-2010 5.7L Challenger only) Do not

re-install the factory engine cover.

Fig. 10-a

Fig. 10-c

Fig. 10-b

Fig. 10-d

Advertising
This manual is related to the following products: