Þ attaching the splay/rear links and the o-ring on – d&b Vi User Manual

Page 15

Advertising
background image

Attaching the Splay/Rear links and the O-ring
The assembly of both the Rear links and the O-ring is carried out in

the following manner:

1. Attach the corresponding item to its dedicated position.

Note: In connection with the bottom frame's Rear link,

observe the direction of attachment as shown in the previous

section Þ "Splay/Rear link positions" on page 14, following

Fig. 7 and Fig. 8.

2. Insert the Fixing bolt.

3. Insert and lock the Ring cotter.

Changing the Splay/Rear link position on Vi Mounting

frames
To change the Rear link position, follow the previous assembly

instructions in reverse order. The procedure for the top frame is

described as an example. The same procedure applies to the

bottom frame.

However, in connection with the bottom frame's Rear link, observe

the direction of attachment as shown in the previous section Þ

"Splay/Rear link positions" on page 14, following Fig. 5 and

Fig. 6.

1. Unlock and remove the ring cotter of the fixing bolt.
2. Pull out the fixing bolt and remove the Rear link.

3. Attach the Rear link to its new position and insert the fixing

bolt.

4. Secure the fixing bolt using the ring cotter and ensure the ring

cotter is properly locked.

d&b Vi Rigging manual (1.2 EN)

15

Advertising
This manual is related to the following products: