Setup preparation, Vi8/vi12 array, Setup preparation 3.2. vi8/vi12 array – d&b Vi User Manual

Page 19

Advertising
background image

3.1. Setup preparation
Check the acoustical and mechanical setup using ArrayCalc and

prepare enough printouts for each array.

The plan enables the riggers to set up the suspension points, the

securing points and the chain hoists.
When on site first:

Clear the working areas and ensure there is enough space to

set up and lift the array.

Check that the hoists are exactly in the specified position.

Ensure the chains are not twisted.

Inspections before setup
Before setup carry out a visual inspection of all system components

for faults. This also includes the loudspeaker and in particular the

rigging parts of the cabinets (Front and Splay/Rear links).

Damaged components must be withdrawn from use immediately.

Please follow the instructions given in Þ Chapter 6. "Care and

maintenance / Disposal" on page 35.

3.2. Vi8/Vi12 Array

Remarks and limitations
In combination with the Z5387.000 Vi Mounting frame top, a

maximum of 4 x Vi-TOP cabinets can be flown.

To fly more than 4 x Vi-TOP cabinets, the Z5380 V Flying frame

must be used.

In this case, please follow the assembly instructions given in the V-

Series Rigging manual, which is supplied with the V Flying frame.

In the manual, refer to "Flown array, section V8/V12 Array".

Preparations
For this type of setup the Rear link of the mounting frame must be

attached to the TOP position. Check the position and alter it if

necessary as described in Þ Chapter 2. "Rigging concept and

components", Þ 2.4. "Rear/Splay links of the frames" .

Note: Observe the direction of attachment as shown in the

graphic opposite.

1. Prepare the first cabinet
Prepare the Front and Splay links of the first cabinet as described

in Þ Chapter 2. "Rigging concept and components",

Þ "Cabinet's rigging mechanism" .

d&b Vi Rigging manual (1.2 EN)

19