Vi-sub column – d&b Vi User Manual

Page 22

Advertising
background image

5. At the rear, align the Rear link with the hole of the TOP

cabinet's Splay link.

6. Reinsert the fixing bolt.
7. Insert and lock the ring cotter.

5. Check the assembly
Before hoisting the array to its operating position, recheck the

actual status of the entire assembly according to the checklist given

in Þ Chapter 4. "Safety and system checks" on page 32.

3.3. Vi-SUB Column

Remarks and limitations
In connection with the Z5387.000 Vi Mounting frame top, a

maximum of 2 x Vi-SUB cabinets can be flown.

For more than 2 x Vi-SUB cabinets, the Z5380 V Flying frame must

be used.

In this case, please follow the assembly instructions given in the V-

Series Rigging manual which is supplied with the V Flying frame. In

the manual refer to "Flown array", section "V-SUB Column".

Preparations
For this type of setup the Rear link of the mounting frame must be

attached to the SUB position. Check the position and alter it if

necessary as described in Þ Chapter 2. "Rigging concept and

components", Þ 2.4. "Rear/Splay links of the frames" .

Note: Observe the direction of attachment as shown in the

graphic opposite.

1. Prepare the first cabinet
1. Prepare the Front links of the first cabinet as described in

Þ Chapter 2. "Rigging concept and components",

Þ "Cabinet's rigging mechanism" .

2. At the rear top, release both Locking pins.

d&b Vi Rigging manual (1.2 EN)

22

Advertising
This manual is related to the following products: