d&b Vi User Manual

Page 27

Advertising
background image

4. Attach the Splay link to its new position and insert the fixing

bolt.

5. Secure the fixing bolt using the ring cotter and ensure the ring

cotter is properly locked.

2. Prepare the first SUB cabinet
1. Prepare the Front links of the first cabinet as described in

Þ Chapter 2. "Rigging concept and components",

Þ "Cabinet's rigging mechanism" .

2. At the rear top, release both Locking pins.

3. Attach the Flying frame to the first SUB cabinet
1. Lower the frame onto the cabinet until the Front links fit into the

slots at the front of the frame.

2. Insert the second Locking pins of the cabinet's Front links on

both sides.

3. On the rear rigging strand of the cabinet, release both Locking

pins.

4. Fold the Splay link into the rigging strand and reinsert the

Locking pins.

d&b Vi Rigging manual (1.2 EN)

27

Advertising
This manual is related to the following products: