Short-form operation instruction – Bronkhorst IN-FLOW User Manual

Page 4

Advertising
background image

BRONKHORST HIGH-TECH B.V.

Short-Form Operation Instruction

Before installing your Mass Flow or Pressure

Meter/Controller it is important to read the attached

label and check:

- flow/pressure rate

- fluid to be metered

- up- and downstream pressures

- input/output signal

Check the red-coloured sticker and make sure the

testpressure is in agreement with normal safety factors

for your application.

Check if the piping system is clean. For absolute

cleanliness always install filters to assure a clean,

moisture- and oil-free gas stream.

Install the Meter/Controller in the line and tighten the

fittings according to the instructions of the supplier of

the fittings. Choose the mounting position according to

the directions given in this manual.

Check the system for leaks before applying fluid

pressure

In systems with corrosive or reactive fluids, purging

with an inert gas is absolute necessary before use.

Complete purging after use with corrosive or reactive

fluids is also required before exposing the system to

air.

Electrical connections must be made with a standard

cable or according to the hook-up diagram in the back

of this manual.

Short form start-up

Install instrument in your process.

Provide instrument with correct pressure(s)

Analog operation

Connect the instrument to the power supply/readout

unit with the 9-pin cable at the DB-9 connector /

8 DIN connector