Chp 4 maintenance, Checkout, Chapter 4. maintenance – Comtech EF Data EQ90 Series User Manual

Page 52

Advertising
background image

Rev. 2

4–1

4

Chapter 4.

MAINTENANCE

This chapter describes the following:

System Checkout

Troubleshooting

Replacement Procedures

4.1 Checkout

CAUTION

This equipment contains parts and assemblies sensitive to damage by ESD.
Use ESD precautionary procedures when touching, removing, or inserting
PCBs.



Note: The checkout procedure in this section provides an indication of overall equalizer
operation and should be performed after initial installation or whenever the equalizer is
suspected of being inoperative. If a discrepancy is detected during the checkout
procedure, refer to the troubleshooting to locate the cause of the fault. After the fault is
located and the repair effected, perform a final checkout procedure before returning the
unit to service.

To perform the equalizer checkout, proceed as follows:

1. Set rear panel power switch (10, Figure 3-2) to 1 (on) position and verify that

front panel indicator status lights.


2. Tag and disconnect system cables attached to the equalizer assembly.

3. Connect a -20 dBm, 75

, 70 MHz (140 MHz option) signal source to rear panel

connector A IN and terminate A OUT into 75

BNC termination cable.

Advertising