CPXV and CPXRV USER INSTRUCTIONS ENGLISH 71569193 09-14

Page 25 of 48

flowserve.com

6.2.4

Mechanical seals

When leakage becomes unacceptable the seal will
need replacement.

6.2.5

Gland packing

Pump must be stopped and

electrically isolated when replacing gland packing.
There is a fan above the packing, close by, on all
high temperature builds of the pump.

On hot molten salt service nitrogen is fed with three
rings of metal packing and Nitrogen will leak across the
packing for cooling purposes.

Occasionally, a new ring of packing will be required to
keep the box full.

On jacketed molten sulphur pumps the stuffing box is
normally supplied with a lantern ring to enable it to be
lubricated to the centre of the packing with the required
Molykote 44 Medium or equivalent grease from a
Staufer or equivalent.

6.3 Spare parts


6.3.1

Ordering of spares

Flowserve keeps records of all pumps that have been
supplied. When ordering spares the following
information should be quoted.

1)

Pump serial number.

2)

Pump size.

3)

Part name – taken from section 8.

4)

Part number – taken from section 8.

5)

Number of parts required.


The pump size and serial number are shown on the
pump nameplate.

To ensure continued satisfactory operation,
replacement parts to the original design specification
should be obtained from Flowserve. Any change to
the original design specification (modification or use
of a non-standard part) will invalidate the pump’s
safety certification.

6.3.2

Storage of spares

Spares should be stored in a clean dry area away
from vibration. Inspection and re-treatment of
metallic surfaces (if necessary) with preservative is
recommended at 6 monthly intervals.

6.4 Recommended spares

(For two years operation - as per VDMA 24296)

Part
no.

Designation

Number of pumps

(including stand-by)

2 3 4 5 6/7

8/9 10(+)

2100

Shaft

1

2

3

30%

2200

Impeller

1

2

3

30%

2400.1

Shaft sleeve - pump
end

2

3

4

50%

3013

Bearing - thrust

1

2

3

4

50%

3300.1 Bearing - pump end

1

2

3

4

50%

3300.2 Bearing - lineshaft *

1

2

3

4

50%

3400.1

Shaft sleeve -
intermediate *

2

3

4

50%

3712

Bearing nut

1

2

3

4

50%

4120

Lantern halves *

1

2

3

30%

4130

Gland packing -
complete set *

2

3

4

40%

4200

Mechanical seals *

1

2

3

30%

2400.2

Sleeve - mechanical
seal *

2

3

4

50%

4305

Lip seal *

4 6

8

9

10

100%

6570.9

Shaft sleeve screw
for 3400.1 *

2

3

4

50%

4590.1** Pump casing gasket 4 6

8

9

12

150%

4590.2

Discharge flange
gasket

4 6

8

9

12

150%

4610.1 O-ring impeller

4 6

8

9

12

150%

4610.2 O-ring carrier

2

3

4

50%

4610.3

O-ring mechanical
seal sleeve *

2

3

4

50%

-

Power end

-

-

-

-

-

1

2

* When required due to fitting as part of the original build specification.

** Note: for CPXRV replace by the following:

4590.1 Pump casing gasket 8 12

16

18

24 300%

Additional spares for keyed impeller option

2912.1/

2912.2

Impeller nut

1

2

3

30%

4610.5 O-ring impeller

4 6

8

9

12 150%

6700.2 Impeller key

1

2

3

30%

6.5 Tools required

A typical range of tools that will be required to
maintain these pumps is listed below:

Readily available in standard tool kits, and dependent
on pump size:

Open ended spanners (wrenches) to suit up to
M 48 screws/nuts

Socket spanners (wrenches), up to M 48 screws

Allen keys, up to 10 mm (A/F)

Range of screwdrivers

Soft mallet

More specialized equipment:

Bearing pullers

Bearing induction heater

Dial test indicator

C-spanner (wrench) - for removing shaft nut.
(If difficulties in sourcing are encountered, consult
Flowserve.)