Checking, Hydraulic loading & unloading system hv 205 – Flowserve HV 205 User Manual

Page 14

Advertising
background image

14

Checking

Hydraulic Loading & Unloading System HV 205

We highly recommend that only qualified staff should carry out maintenance work in
accordance with these maintenance instructions. The manufacturer expressly rejects any
claims for damage caused by improper maintenance work.

All parts to be fitted must meet the technical requirements specified by the manufacturer.
All genuine parts are guaranteed to comply with these requirements.

For installation and removal work choose lifting devices that are specified for the
respective weights. Use only suitable and proper lifting devices.

Make sure that the gaskets of the flanged connections are exactly placed between the
flanges. Clean all seating surfaces before installing the equipment.

The specified torques and tolerances must be strictly observed. Use appropriate tools
and testing devices.

Before performing any service work inside the tank make sure that the tank is sufficiently
ventilated and all gases have been completely vented. The rules concerning MAC
(= maximum allowable concentration) values at place of work must be strictly applied!

Remove the transport packing and all transit protection plugs for end connections before
installing the valves.

Advertising