Operation – Flowserve HV 205 User Manual

Page 30

Advertising
background image

30

Operation

– continued –

Operation

- continued -

Close bottom valves immediately after loading or unloading the tank.
Drawing see page 4

1.

To close the bottom valves

disengage the rail hook

from the rail. This results in

the tension rope

being loosened. The ball valve of the control unit

opens the

hydraulic system and both rapid-action bottom valves

will be closed

instantaneously. Be sure that both bottom valves

are closed by checking the

indicating pistons

of the indicating cylinder

. Both indicating pistons must be

retracted.

2.

Then close and latch the operating device

.

3.

To finish the loading/unloading process close the shut-off valves

and attach

sealing plugs to shut-off valves

.

A

I

F

C

A

A

O

K

B

E

E

Attention

Note: If the lid cannot be closed, one or both bottom valves are still open!
The inside of the lid of the operating device features a bracket. This
bracket prevents the closing of the lid when one or both bottom valves are
open. The lid can only be closed when the indicating pistons are retracted.
The cause of this malfunction must be ascertained and eliminated!

If only one operating device for the loading system was opened, the lid of
the other operating device cannot be opened when the bottom valves are
open.

Advertising