Operation – Flowserve HV 205 User Manual

Page 29

Advertising
background image

29

Operation

Operation

During the loading process the following actions will take place:



Opening of bottom valve



Closing of bottom valve

To open / close the bottom valves

operate one of the operating devices

at either side

of the tank.
Drawing see page 4

If necessary remove custom's lead seal from the bolt

when opening the operating

device

.

1.

To open the operating device

push the bolt

upwards and then turn it by 90° to

one side. You can now swing down the lid.

2.

Make sure that the pump lever

of the hydraulic pump

is completely extended to

the front.

3.

Connect the rail hook

(e. g. rail hook type VZ 10) to the tension rope

and

engage it in the rail. Pull the tension rope

tightly such that the ball valve of the

control unit

is closed and the hydraulic system is ready for operation.

4.

The up-strokes and down-strokes of the lever

of the hydraulic hand pump

in the

operating device

built up pressure in the hydraulic system, resulting in the

simultaneous opening of both bottom valves

. After approx. six strokes of the pump

lever

both bottom valves

will be completely open. Check position of bottom

valves: The opening position of the bottom valves

is indicated by the two indicating

pistons

of the indicating cylinders

which must be completely moved out (lift of

indicating pistons approx. 46mm).

5.

Open the lateral shut-off valves

to start the loading/unloading process.

6.

The pump lever

of the hydraulic pump

is no longer required and must be

returned to its original position.

A

B

M

B

B

M

J

T

I

F

F

C

J

T

B

A

J

A

A

O

K

E

J

T

Attention

If only one operating device for the loading system was opened, the lid of
the other operating device cannot be opened when the bottom valves are
open.

Advertising