Operating device bv 100, Control unit xv 100, Operating device bv 100 control unit xv 100 – Flowserve HV 205 User Manual

Page 16: Checking

Advertising
background image

16

Checking

– continued –

Operating Device BV 100

Control Unit XV 100

Type of maintenance

Time interval

Activity

Check oil level

When necessary,

during main

inspection at the

latest

(every 4 yrs.)

The level in the tank of the hydraulic hand

pump must be above the lower marking on

the dip stick.

Check tightness

When necessary,

during main

inspection at the

latest

(every 4 yrs.)

Make sure that oil cannot escape at

connections, joints and T-type screwed

unions. If necessary, retighten respective

connections.

Check valve lift

When necessary,

during main

inspection at the

latest

(every 4 yrs.)

With the hydraulic system closed, after

approx. 6 lifts of the hydraulic hand pump

both indicating pistons must be completely

extended (height approx. 46 mm).

Check holding pressure

When necessary,

during main

inspection at the

latest

(every 4 yrs.)

With the hydraulic system closed, both

bottom valves must withstand a constant

pressure for two hours without closing.

Check rapid-action
closing

When necessary,

during main

inspection at the

latest

(every 4 yrs.)

When disengaging the tension rope the

rapid-action closing must take place within

one second and the indicating pistons must

be at the lower marking.

Check completeness

When necessary,

during main

inspection at the

latest

(every 4 yrs.)

Both operating devices must have two

emergency operating screws each. These

emergency operating screws must be

screwed in the rear wall.

Type of maintenance

Time interval

Activity

Check smoothness of

operation

of ball valve shaft

When necessary,

during main

inspection at the

latest

(every 4 yrs.)

Check smooth operation of switching shaft.

If the switching shaft does not move

smoothly apply a commercially available

lubricant.

35

Advertising