Work cable replacement, Powermax1000 – Hypertherm Powermax1000 Service Manual User Manual

Page 68

Advertising
background image

MAINTENANCE

1

powermax1000

Service Manual

3-35

Work cable replacement

Disconnect the electrical power, gas supply and torch lead before removing the old work cable.

1. Install the strain relief on the power supply and secure it with a nut.

2. Tighten the strain relief collar onto the cable.

3. Connect the work cable to the power board

at J14. Tighten the nut to 10 in-lb (12 kg cm)
of torque.

4. Install the ETR barrier.

5. Install the power supply cover.

ETR
barrier

Strain relief

Connect to J14

Work cable

Caution:

This is a high-current connection.
Proper torque is critical.

Advertising