Mounting to forklift floor, Or 2.3) – Datalogic Scanning Rhino-NET 40012 User Manual

Page 21

Advertising
background image

INSTALLATION

2

2.3 MOUNTING TO FORKLIFT FLOOR


This type of installation may decrease the range of the radios located in the bottom of the
Rhino-NET™ terminal.

Follow these instructions as general guidelines:

1 Find the most suitable place on the forklift floor to mount Rhino-NET™: it should be as

protected as possible against water and dust, and it should not be an obstacle to the
operator's movements.


2 The slots on the bracket will help obtain the best positioning. When working in

environments characterized by strong vibrations, set the screws as close as possible to
the bracket edges, see Figure 6.


3 Tighten the ST-222 bracket to the forklift using the screws and washers. In the absence

of a surface area to mount to, the ST-247 Counter Bracket can be used to sandwich the
forklift frame between the two brackets. The threaded hole for the set pin at the top of
the ST-222 should be at user's left-hand side when facing in front of the terminal, see
Figure 6 and Figure 7.

Figure 6 - ST222 Bracket Screw Positioning for Floor Mounting


4 Position Rhino-NET™ at the top of the bracket: make sure the two large round openings

coincide to the ones located at the edges of Rhino-NET™.


5 While supporting the Rhino-NET™, rotate the whole device until it is aligned for the best

viewing position, then insert the set pin screw with locking washer until it inserts into one
of the small positioning holes located on the terminal bracket. See par. 2.4.


6 Place a locking washer and then a flat washer onto each knob. Tighten Rhino-NET™ to

its bracket by screwing the knobs into their holes - one on each side.


7 After connecting the power supply cable to the forklift battery as described in par. 2.5

insert the power supply cable connector into the Rhino-NET™ socket by pressing in
while rotating the external metal ring clockwise.




7

Advertising