Lpc 48 / 96 users manual – Leprecon LPC V3 User's Manual User Manual

Page 108

Advertising
background image

LPC 48 / 96 Users Manual

Page
108

11.1.3 Sequencing

Click on the ‘Sequence’ tab to get access to the sequencing controls:

Sequencing fixtures will apply staggered ‘wait’ times to each fixture. To sequence

the fixtures:

• Select fixture names from the effect. Click ‘Add’ to create the sequence

• Arrange the correct order using up and down arrows next to the Sequence

list.

Advertising