19). Replace the NG Pilot orifice with the LP Pilot orifice. If you

get the orifices mixed up, the LP orifice has a grove machined

around the diameter near the end.

22). Connect the unit to the gas and electrical supply.
23). Before concluding the conversion, make sure you leak test

the entire system and check all operational functions to ensure

that the unit is performing safely and properly.

Figure 33 Sec.4

20). Reverse steps to install pilot hood.

24). Fill out required information on LP conversion label.

Figure 34 Sec.4

25). Remove rating plate from under appliance and turn it over

to the blank side.

Figure 35 Sec.4

26). Apply sticker to blank side. Put rating plate back.

Figure 36 Sec.4

21). The minimum primary air setting is different depending on fuel

and burner. The minimum primary air is set by hand-bent tabs on

the primary air adjustment. Bend the appropriate tab down for your

fuel and burner. See specifications table or primary air adjustment

for proper tab. See image below for tab lengths. If your setting is

fully closed, bend both tabs up.

Figure 37 Sec.4

1/16 "

3/16 "