Receiving and unpacking, Before installation – Nortec RH2+ User Manual

Page 5

Advertising
background image

Introduction | 2




Receiving and Unpacking

1 Check packing slip to ensure ALL material has been delivered.
2 All material shortages are to be reported to Nortec within 48 hours from receipt of goods.

Nortec assumes no responsibility for any material shortages beyond this period.

3 Inspect shipping boxes for damage and note damages on shipping waybill accordingly.
4 After unpacking, inspect equipment for damage and if damage is found, notify the shipper

promptly.

5 All Nortec products are shipped on a Free-On-Board (FOB) factory basis. Any and all damage,

breakage or loss claims are to be made directly to the shipping company.

Before Installation

1 Ensure that available voltage and phase corresponds with humidifier voltage and phase as

indicated on humidifier’s specification label.

2 Ensure that the dedicated external fuse disconnect is of sufficient size to handle the rated

amps as indicated on the specification label. Refer to local codes.

3 Report any discrepancy immediately to the site engineer, if applicable.
4 Ensure sufficient clearances will be available as described in the Location section on pg 7.

5 Ensure steam lines can be routed to duct distributor or blower pack as described in Steam

Lines and Condensate Return Instructions on page 12.










Figure 1: Specification Label Location

MADE IN CANADA

MODEL:

VOLTS 1:

F.L.A:

KW:

XXXXXXXXXXXXXXXXXXXXXXXX

S/N:

XXXXXXX

XXXXXXXXX

PHASE:

XXXX

HZ:

XXXXX

XXXXXX

DATE:

XXXXXXXXX

VOLTS 3:

XXXXXXXXX

VOLTS 2:

XXXXXXXXX

F.L.A:

XXXXX

F.L.A:

XXXXX

XXXXXX
XXXXXX

KW:
KW:

Advertising