Installation – Desa FPVF33NRA User Manual

Page 19

Advertising
background image

www.desatech.com

113109-01D

19

OpTIONAL WIRELESS HAND-HELD
REMOTE CONTROL ACCESSORIES
(HRC100 and HRC200)

Installing Remote Receiver Unit
1. Disconnect switch wires from the con-

trol valve.

. Remove screws attaching switch plate.
3. Remove switch plate (see Figure 33).

Discard after removing.

Figure 33 - Switch Plate and Wiring

Harness

Figure 34 - Installing Remote Receiver

Valve

White Wire
From Receiver

Screw

Switch Plate

Wires

Remote
Switch
Bracket

Ignitor

Remote Receiver

Mounting
Clips

Figure 35 - Connecting Wires

Red Wire From
Receiver

INSTALLATION

Continued

O

F
F

P

ILO

T

O

N

H

I

L

O

Chassis

Burner

One Piece
Log Set

Middle
Section at
Bottom of
Log Set

"U" Shaped
Cutout In
Chassis

Figure 31 - Installing One Piece Log Set

Figure 32 - Installing One Piece Log Set,

Top View

One Piece
Log Set

Burner Ports

4. Install remote receiver unit onto gas log

heater base using mounting clips.

5. Push clips firmly into place (see Figure 34).
6. Connect wires as shown in Figure 35.

INSTALLING 9-VOLT BATTERIES

Two 9-volt batteries (not included) are re-
quired to operate this heater with the wireless
hand held remote control set. Install one bat-
tery in the receiver and one in the hand-held
remote control unit. Note: Only use alkaline
batteries.
Installing 9-Volt Battery in Receiver
1. Locate back of receiver under front burner

of heater.

. Locate the battery clip mounted on the

back of the receiver.

3. Slide a 9-volt battery through the clip.
4. Attach the terminal wires to the battery.

Figure 36 - Installing Battery in Remote

Receiver

Battery Clip

9-Volt Battery

Remote
Receiver

Terminal Wires

Advertising