Installing the router, Installation flow, Check before installation – H3C Technologies H3C SR6600-X User Manual

Page 18

Advertising
background image

8

Installing the router

NOTE:

The fan tray, power modules, FIPs, and interface modules are hot swappable.

Installation flow

Figure 3 SR6602-X installation flow

Check before installation

Follow these guidelines to prepare for installing an SR6602-X router:

•

Make sure that you have read “

Preparing for installation

” carefully and the installation site meets all

the requirements.

•

Prepare a 19-inch rack.

•

Make sure that the rack is sturdy and securely grounded.

•

Make sure that there is sufficient clearance around the rack for heat dissipation and installation.

•

Make sure that there is no debris inside or around the rack.

•

Move the router to a place near the rack.

Advertising