2 connecting dc main cables to the busbar – SMA SSM8-21-BS User Manual

Page 28

Advertising
background image

6  Electrical Connection

SMA Solar Technology AG

28

SSMxx-21-IA-BS-JP-en-20

Installation Manual

6.5.2 Connecting DC Main Cables to the Busbar

Figure 12: Assembly of the connection with a ring terminal lug

Additionally required material (not included in the scope of delivery):

☐ Ring terminal lugs (size: for M12 screw)
☐ Clean cloth
☐ Ethanol cleaning agent

Procedure:

1. Strip off the DC main cable insulation.
2. Fit the DC main cables with ring terminal lugs.
3. Clean the contact surfaces using a clean cloth and ethanol cleaning agent. Do not touch the contact surfaces after

cleaning.

4. Connect the DC main cables in accordance with the circuit diagram (torque: 60 Nm). Only use the supplied

fastening material and connect a maximum of two adjacent DC main cables to each busbar.

5. Secure the DC main cables to the cable support rail.

Position

Designation

A

Screw M12

B

Spring washer

C

Fender washer

D

Tin-plated copper bar

E

Tin-plated ring terminal lug

F

Nut M12

Advertising
This manual is related to the following products: