SMA SSM8-21-BS User Manual

Page 39

Advertising
background image

SMA Solar Technology AG

7  Commissioning

Installation Manual

SSMxx-21-IA-BS-JP-en-20

39

Figure 16: Termination of the Sunny String-Monitors (example)

Requirement:

☐ All Sunny String-Monitors in a string are connected to the RS485 communication bus (see Section 6.7 "Connecting

the Data Cables", page 31).

Procedure:

1. In the last Sunny String-Monitor of each string, plug the jumper into

pin header S1 at position T on the lowest String-Monitor Unit.

2. Make sure that in the other Sunny String-Monitors of the string, the

jumpers are plugged into pin header S1 at position P of the lowest String-Monitor Unit.

Advertising
This manual is related to the following products: