Power-up diagnostics, 4 option components – Yaskawa EtherNet/IP User Manual

Page 13

Advertising
background image

Name

Display

Operating Status

Remarks

Color

Status

10/100

<1>

Green

OFF

10 Mbps is established

Green

ON

100 Mbps is established

LINK/ACT

<1>

Green

OFF

LINK is not established

Green

ON

LINK is established

Green

Flashing

LINK is established and

there is network activity.

<1>

Remove the cover to check the status of the LED. Be careful not to touch the main circuit terminals or the control
board in the drive.

n

Power-Up Diagnostics

An LED test is performed each time the drive is powered up. The initial boot sequence may

take several seconds. After the LEDs have completed the diagnostic LED sequence, the option

is successfully initialized. The LEDs then assume operational conditions as shown in

Table

3

.

Table 4 Power-Up Diagnostic LED Sequence

Sequence

Module Status (MS)

Network Status (NS)

Time (ms)

1

Green

OFF

250

2

Red

OFF

250

3

Green

OFF

4

Green

Green

250

5

Green

Red

250

6

Green

OFF

4 Option Components

YASKAWA TOEP YAICOM 16A 1000-Series Option Dual-Port EtherNet/IP SI-EN3D Installation Manual

13

Advertising