5 Installation Procedure

YASKAWA ELECTRIC TOBP C730600 52C 1000-Series Option PG-E3 Installation Manual

13

3.

Route the option wiring.
Depending on the drive model, some drives may require routing the wiring through

the side of the front cover to the outside. In these cases, cut out the perforated

openings on the left side of the drive front cover as shown in

Figure 5

(A) and leave

no sharp edges to damage wiring.

Route the wiring inside the enclosure as shown in

Figure 5

(B) for drives that do not

require routing through the front cover.

For more information, refer to the Peripheral Devices & Options section of Yaskawa

AC Drive Technical Manual in your application.

Figure 5

Figure 5 Wire Routing Examples

A – Route wires through the openings

provided on the left side of the
front cover.

<1>

<1> The drive will not meet NEMA Type 1 requirements if wiring is exposed outside the enclosure.

B – Use the open space provided

inside the drive to route option
wiring.

B

A