Installation and assembly assembling the cladding – MCZ Flair User Manual

Page 28

Advertising
background image

A

b

b

b

b

c

c

c

c

c

c

b

b

26

6-INSTALLATION AND ASSEMBLY

ASSEMBLING THE CLADDING

ASSEMBLING THE CERAMIC SIDE PANELS

The product is supplied with the ceramic panels packaged separately, therefore unpack all the parts before proceeding with the assembly.

Follow the sequence below to assemble the panels:

• Flaps “b” on t

he lower part of the ceramic panel A must be fitted into the holes of the structure of the stove. Then fasten the panel to

the structure - pos.c - with the screws supplied (two screws at the top).

Advertising
This manual is related to the following products: